Taxilane F is a new taxiway serving a commercial tenant on the north side of the airport. EG Solutions is the engineer of record for the design, permitting and construction phase services.

The Taxilane is a flexible pavement approximately 450 feet in length and 50 feet in width connecting to existing Taxiway B.

Services included topographical surveys, geotechnical investigation, geometric layouts, pavement design, stormwater management design and permitting, electrical modifications, signage, markings, bidding and construction services.

The EPA SWMM model for surface water hydrology, hydraulics and water quality had to be refined as part of the overall master drainage plan update. The refined models reflect a more detailed, project specific date as opposed to the airport-wide information used for the master drainage plan update.

Project Taxilane F
Client City of Naples Airport Authority, Naples Municipal Airport
Location Naples, Florida