Sarasota-Bradenton International Airport has an existing perimeter drainage system which was improved and permitted with the Southwest Florida Water Management District. Subsequent projects at the Airport have employed and modified the original calculations that the plan was based on, and other major works by local governments have impacted the receiving waters downstream. The project consisted of updating the master drainage plan and calculations to reflect the changes that have occurred since the date of the original permit. The master drainage plan calculations include a mathematical model of the Airport system utilizing the EPA-SWMM software. Ongoing project work by other Firms is also reviewed for compliance with the plan on behalf of the Airport.