EGS was retained to complete a master drainage plan update for SRQ and the update resulted in several stormwater system improvements. This project reduced/modified ponds that were attractants for hazardous wildlife thereby improving safety while allowing approximately 111 acres of aviation business development […]
EG Solutions was the engineer of record for this project. The project included improvements to the stormwater management system located in the west quadrant of the Naples Municipal Airport consisting of construction of the West Quad Pond in an area adjacent to a […]
Sarasota-Bradenton International Airport has an existing perimeter drainage system which was improved and permitted with the Southwest Florida Water Management District. Subsequent projects at the Airport have employed and modified the original calculations that the plan was based on, and other major works […]
The project had two objectives. The immediate objective of the project was to support Taxiway A extension. The larger objective in the project was to use the results of the Pond Design Criteria Study to improve water quality using design features consistent with […]
Program Manager and Technical Manager depending on project Phase. Initial program development and federal grant application assistance. Stakeholder committee development with Federal Aviation Administration, Florida Department of Transportation, Florida Department of Environmental Protection, South Florida Water Management District, and St. John’s River Water Management […]
EG Solutions was the Engineer of Record for the project in response to a part 139 inspection that found deficiencies in the Runway Safety Area (RSA) caused by drainage swales and structures. Also, the Wildlife Hazard Management Plan (WHMP) for the airport recommended […]